1
/
of
1
SKU:440-GREEN
Shires extra Long Lead Rope 3Mtr
Shires extra Long Lead Rope 3Mtr
Regular price
QAR 33,00
Regular price
Sale price
QAR 33,00
Shipping calculated at checkout.
🚚 Doha delivery available • 📞 WhatsApp advice: 66682040
Quantity
Quantity (21 available for this variant · 51 total all variants)
Couldn't load pickup availability
The Shires Extra Long Lead Rope, 3 Metres provides extended reach for handlers who need more distance during in-hand training, lunging preparation, or working with more forward-going horses.
- Length: 3 metres — extra reach for training and groundwork
- Brass swivel trigger clip — smooth rotation, tangle-free handling
- Durable construction for daily use
- Made by Shires, England
Available at Nice Equestrian, Ezdan Oasis, Wukair, Doha, Qatar.
Also from Shires: Shires Topaz Lead Rope 1.8M | Shires Headcollar Lead Rope with Trigger Clip 2M
More lead ropes: QHP Luxury Lead Rope 3M | Waldhausen Lead Rope 2M | Horze Supreme Lead Rope
Share
